Our longest running series of projects – 1987 to 2025 (scheduled).
DNA have been sub-contracted by ERM Hong Kong for the Independent Consultant role for implementation of the second 15 year “follow on” contract for the operation of the chemical waste treatment facility in Hong Kong, awarded to Ecospace / Kum Shing Joint Venture. Our role is checking, on behalf of the Hong Kong government, the design and development of the replacement incineration and healthcare waste sterilisation system.
The facility was originally constructed in the early 1990’s and was commissioned in 1994. DNA led the technical team from the initial feasibility study in 1987, through contracts development and tendering, to assisting the Hong Kong government during the commissioning and first year of operation.